Header Graphic
New Fellowship Hall > Below-floor utilities are in place
Image 34 of 66
Below-floor utilities are in place

Below-floor utilities are in place

The extensive water, wastewater, electrical, telephone, and Heating, Ventilation & Air Conditioning pipework is all in place before the big pour. 11/2/05