|
New Fellowship Hall>
A Photo Essay of the Building of a New Fellowship Hall at Kanapaha Presbyterian Church
Escavating Clay
Andrews Paving was contracted to follow behind Concrete Recycling once the building was fully removed. Shown here, Andrews Paving is digging out the clay substrate that so wrecked the foundation of the old building. 8/10/05
|